Pad-mounted transformers 45–5000 kVA, 26–36 kV — UL File E529552. Standard lead time 5–8 weeks from contract; volume schedules confirmed per project. UL File E529552 · pad-mounted 45–5000 kVA — 5–8 weeks from contract, volume per project Send your one-line diagram →
YGT Logo
Chat with us

Three-phase liquid-immersed · UL File E529552

Padmount Transformers

45–5000 kVA at 26–36 kV primary. Dead front, loop or radial feed, aluminium windings, mineral oil or natural ester.

UL File E529552 (CCN XPLH/XPLH7)

Verify the file number yourself on UL Product iQ

5–8 week build

From contract, confirmed against the approved drawing

Traceable documents

Type-test reports supplied per project

Why buyers move a padmount order to us

Six things that decide most North American padmount enquiries, and where we actually stand on each.

Delivery is the bottleneck, not price

A standard build runs 5–8 weeks from contract. Confirmed per project and per contract.

A file number you can check yourself

UL File E529552. Search it on UL Product iQ before you reply to us. We would rather you verify than take our word.

Loop and radial, both built

Dead front with loop feed or radial feed. Bushing count, parking stands and switch arrangement follow your one-line.

Natural ester where it is required

Mineral oil or natural ester, both inside the UL listing. Ester is specified on many indoor, vault and environmentally sensitive sites.

Aluminium windings, stated openly

The padmount listing covers aluminium. If your spec mandates copper, say so early — that moves you to a different series and a different evaluation.

Answers the same working day

Send a one-line or a nameplate photo. Rating, price and a real delivery date come back the same working day.

A padmount transformer manufacturer built around project delivery

We build three-phase liquid-immersed padmount transformers to order, against your one-line diagram and site standard, not from a catalogue of stock sizes. Every unit is routine tested before dispatch and shipped pre-assembled on its own pad. The work we take is project work — utility distribution, solar and storage, data centre and industrial sites — where a confirmed delivery date matters as much as the rating.

Which type fits your site

Three build types cover most enquiries. The first two sit inside our UL listing; the third does not, and we say so.

Three-phase dead-front padmount transformer rated 300 kVA, front view with the cabinet doors closed
IN UL FILE

Three-phase padmount · PM3

45–5000 kVA, 26–36 kV primary, 0.1–6.9 kV secondary. Dead front, loop or radial, aluminium windings, mineral oil or natural ester.

Three-phase liquid-immersed substation type transformer in the assembly bay
IN UL FILE

Substation type · SF / SA

30–7500 kVA across 17–36 kV. Where a padmount enclosure is not required and the unit sits inside a fenced substation.

Single-phase padmount transformer with its enclosure closed, shown inside the factory
NOT IN UL FILE

Single-phase padmount

We build it, and it is not covered by that listing — the file is three-phase only. Certification is arranged per project.

Built to the standard your utility will check

Evaluated to IEEE C57.12.00, C57.12.28 and C57.12.90. Eight construction points that come up in nearly every technical review.

Dead front

Separable elbow connectors, no exposed live parts.

Tamper resistant

Pentahead bolts, recessed handle, padlockable.

Loop or radial

Six or three HV bushings to suit the feed.

Bayonet fusing

Oil-immersed bayonet plus backup current-limiting.

Ester option

Natural ester or mineral oil, both listed.

Corrosion finish

Blasted, primed and powder coated to C57.12.28.

Routine tested

Every unit tested before it leaves the floor.

Ships assembled

Arrives complete on its pad, ready to set.

Build time for a padmount transformer

We build to your drawing, not from stock. A standard padmount transformer build runs 5–8 weeks from contract, against the approved drawing.

Final lead time is confirmed per project and per contract, against the approved drawing.

Which Padmount Transformer Series Fits Your Project?

Three listed series. The file number is published rather than the claim, because the number is what your compliance reviewer will actually check on UL Product iQ.

Three-phase dead-front padmount transformer rated 300 kVA, front view with the cabinet doors closed
PM3 SERIES

Three-phase padmount transformer

The mainstream padmount transformer for utility distribution. Dead front, loop or radial feed, aluminium windings, mineral oil or natural ester.

Rating
45 – 5000 kVA
Primary
26 – 36 kV
Secondary
0.1 – 6.9 kV
Three-phase liquid-immersed substation type transformer standing in the factory assembly bay
SF SERIES

Substation type, 26–36 kV

Where the padmount transformer enclosure is not required and the unit sits inside a fenced substation on the same voltage class.

Rating
30 – 5000 kVA
Primary
26 – 36 kV
Secondary
0.1 – 1.5 kV
SA series substation type transformer installed on a concrete pad
SA SERIES

Substation type, 17–26 kV

Copper windings, and the largest rating in the file. For 25 kV class systems where a padmount transformer is not the right form factor.

Rating
112.5 – 7500 kVA
Primary
17 – 26 kV
Secondary
0.1 – 4.16 kV

Evaluated to IEEE C57.12.00, C57.12.28 and C57.12.90. Canada: CCN XPLH7 on UL File E529552, to CSA C227.4, 75–3000 kVA.

Outside this scope

Dry-type, single-phase, live front, primary below 17 kV (including 15 kV class), above 36 kV, and above 7500 kVA are not covered by this file. We will say so rather than imply otherwise. Units outside the listing are supplied with project-specific certification and third-party testing arranged per contract.

How your padmount transformer is built, tested and shipped

Three-phase padmount transformer, enclosure closed, showing rating and voltage markings
Finished padmount transformer before dispatch. Rating and voltage are marked on the enclosure.
Padmount transformer being loaded onto a truck by forklift
Loading for export. Every padmount transformer is routine tested at the factory before dispatch.
Padmount transformer installed on a concrete pad at a project site
Installed on its pad. Commissioning requirements are confirmed per project and site conditions.

Photographs show production units. Ratings and certification coverage for any specific padmount transformer are confirmed per project and per contract.

Tools and documents

Sizing tools you can use now, and the documents we can release. Test reports themselves are covered by UL confidentiality and are shared per project, not published.

Certificate of Compliance and the listed model ranges are public on UL Product iQ. Follow-Up Service Procedures and test records are not ours to publish.

The factory behind the padmount line

Zhejiang Jiangshan Yuanguang Electric builds liquid-immersed distribution and substation transformers for export projects, with the padmount line evaluated by UL to IEEE C57.12.00, C57.12.28 and C57.12.90. Units are wound, assembled, filled and routine tested on site, then shipped pre-assembled. Better-Energy carries the same manufacturing lineage, tracing back to ZQ (Zhejiang Switchgear, 1965).

Quality management to ISO 9001 and ISO 14001. Capability for any specific rating is confirmed per project.

Three-phase liquid-immersed substation type transformer standing in the factory assembly bay Padmount transformer wrapped in protective film and staged in the factory for shipment

What the factory has shipped

Padmount units come off one line in a plant that also builds transmission-class machines. The record below is for the power transformer line, 35 kV and above — not padmount. It is shown for one reason: that is the part of the plant an auditor looks at hardest, and it tells you what the winding, tanking and test facilities are actually rated to do.

14
export markets
Central Asia, Africa, Southeast Asia, Eastern Europe, Latin America
60
units exported, 2023–2026
Counted line by line from the delivery register
230 kV
highest class shipped
One 36/48/60 MVA unit, 230–34.5/19.92 kV, Mexico, 2024
Market Units Years Representative rating
Kyrgyzstan13202516 MVA / 36.75–10.5 kV
Rwanda92024–202620 MVA / 110–15 kV
Uzbekistan72023–202610–25 MVA / 110 kV
Ukraine4202540 MVA / 115–27.5–11 kV
Madagascar5202525 MVA / 63 kV
Mexico42024–2025up to 60 MVA / 230–34.5 kV
Tajikistan4202616 MVA / 110 kV
Philippines3202512 MVA / 13.8–4.16 kV
Albania3202425 MVA / 110–37–20.8 kV
Zambia3202610 MVA / 33–11 kV
Malaysia2202531 MVA / 33–11–0.415 kV
Georgia, Laos and Kazakhstan32024–20262.5–50 MVA / 35–115 kV

Why a power transformer record sits on a padmount page

A padmount transformer is a simpler machine than a 230 kV unit. A plant that builds, tests and ships the second has the first comfortably inside its envelope. That is the whole claim. It is not padmount delivery experience, and it is not part of the UL listing — the UL scope is set out separately above and is the document to read for compliance.

How these figures were counted

Counted line by line from the delivery register, export lines only. Domestic deliveries and lines without a recorded destination are excluded, so the real export total is higher than the figure shown. Customer names, project names and contract values are not published: several units were supplied through trading partners, whose client relationships are theirs to disclose. Delivery documentation for a specific line can be reviewed under NDA.

Where these units go

Four application patterns that account for most of what we quote.

Utility distribution

Loop-feed dead front units on residential and commercial feeders. Bushing arrangement, fusing and finish follow the utility standard rather than a catalogue default.

Solar and battery storage

Collector-side step-up duty with the load profile of an inverter plant. Impedance and tap range are set against the inverter and the interconnection study, not assumed.

Data centre and critical load

Where the schedule is the constraint. Natural ester is frequently specified here for fire performance inside or close to the building envelope.

Industrial and mining sites

Motor-heavy loads where inrush and short-circuit contribution drive the impedance choice. A coordination study should confirm the figure before the rating is fixed.

Specification

Rating45 – 5000 kVA
Primary voltage26 – 36 kV
Secondary voltage208Y/120 · 480Y/277 · 600Y/347 and others
Frequency60 Hz
Vector groupDyn1, Dyn11 and others to order
ImpedanceTypically 5 – 6 %, specified to suit downstream ratings
WindingsAluminium
Insulating fluidNatural ester or mineral oil
CoolingONAN
Temperature rise65 °C
EnclosureDead front, tamper-resistant, pad-mounting
FeedLoop feed or radial feed
AccessoriesBayonet fuses, load-break switch, pressure relief, liquid level and temperature indication

Parameters not listed are confirmed per project. Where a value affects a contractual obligation — losses, impedance, temperature rise, short-circuit withstand — it is confirmed against the test report, not estimated.

Questions we get asked

Do you supply single-phase padmounts?

We manufacture them, but single-phase is not covered by that listing — the file is three-phase only. Certification for single-phase units is arranged per project.

What do you need to quote?

Rating, primary and secondary voltage, vector group, impedance if specified, fluid type, feed arrangement, and any utility or site standard that applies. A one-line diagram or a spec sheet is enough to start.

Months, not years.

The rating is the easy part. The delivery date is what your schedule actually turns on.

Things you can check without asking us

We do not publish customer quotes. Buyer names, projects and contacts stay confidential, and an anonymised testimonial proves nothing. These can be verified independently instead.

The UL file

Search the file on UL Product iQ. You will see the listed model series and the company name, straight from the certification body.

Open UL Product iQ →

The standards

IEEE C57.12.00, C57.12.28 and C57.12.90 for the US listing; CSA C227.4 for Canada. Named editions, not a generic claim of compliance.

The boundary

We publish what the file does not cover as plainly as what it does. Single-phase, dry-type and 15 kV class are outside it. Suppliers who list everything as certified are worth a second look.

Send your specification

Ratings, lead time and certification coverage Ratings, lead time and certification coverage are confirmed per project and per contract.

Specifying a padmount transformer

What actually decides the build. Open any topic that applies to your project — or send the one-line and we will tell you which ones matter.

Loop feed or radial feed

This is the first fork, and it changes the tank. A radial-feed unit is fed from one direction and carries three high-voltage bushings. A loop-feed unit sits in a run with other transformers and carries six, so the circuit can pass through and be sectionalised without dropping every customer downstream. Loop feed costs more and takes more room in the HV compartment, and most utility distribution work specifies it because a fault on one segment should not black out the whole loop. If your one-line shows the transformer in the middle of a run, you are almost certainly looking at loop feed even if the specification does not say so.

Dead front is not a style preference

Dead front means the high-voltage terminations are separable elbow connectors that are fully insulated and shielded, with no exposed energised metal when the compartment door is open. Live front, the older arrangement, leaves porcelain bushings exposed behind a barrier. In North America dead front is effectively the default for padmount installations in public areas, and it is what our UL listing covers. If a specification asks for live front, that unit falls outside our listing and we will say so rather than let the certification carry over by implication.

Impedance is a decision, not a fixed property

Impedance determines two things that pull in opposite directions. Lower impedance gives better voltage regulation and easier motor starting, but raises the available fault current at the secondary, which drives up the interrupting rating of everything downstream. Higher impedance limits fault current and lets you use cheaper downstream gear, at the cost of more voltage dip. Typical values run 5–6 percent for distribution ratings and 6–8 percent for larger units, but a specific value can be built if the downstream equipment rating or the motor starting requirement demands it. Whatever you choose, the tested impedance on the unit’s own test report is the figure a coordination study has to use — not the nameplate target and not a typical value from a table.

Mineral oil or natural ester

Both are inside our listing, so this is a project decision rather than a supplier constraint. Natural ester has a much higher fire point, which is why it appears in specifications for units inside buildings, in vaults, near occupied structures, or on sites with spill and environmental constraints. It is also readily biodegradable. The trade-offs are cost, slightly different thermal behaviour, and the need to keep the fluid type consistent with the site maintenance programme — ester and mineral oil are not casually interchangeable once a unit is in service. If your site standard is silent on fluid, the fire code and the distance to the nearest occupied structure usually settle it.

Aluminium and copper windings

Our padmount listing covers aluminium windings. Aluminium is the mainstream choice for distribution padmounts in North America: lighter, lower material cost, and entirely standard in utility service when the conductor is sized correctly. Copper is specified on some industrial and institutional projects, occasionally for space reasons and occasionally as an inherited habit. If your specification mandates copper, raise it at enquiry stage — it moves the unit to a different series with a different evaluation, and it is better established before quotation than after.

Fusing and protection

Most padmount units use oil-immersed bayonet fuses in series with backup current-limiting fuses. The bayonet is the accessible, replaceable element that clears overloads and low-level faults; the backup current-limiting fuse handles high-magnitude faults that the bayonet cannot interrupt safely. The pairing matters, because a bayonet alone leaves the unit exposed on a bolted fault and a current-limiting fuse alone makes routine maintenance far more disruptive. If the specification names a particular fuse curve, send it — fuse coordination is easier to build in than to retrofit.

Taps, and why the range gets missed

De-energised tap changers on padmount units typically give plus or minus two 2.5 percent steps on the primary. That is enough to trim for a long feeder or a high source voltage, and it is not enough to solve a genuine voltage problem. On solar and storage sites the tap range is regularly wrong on first pass, because the collector-side voltage under full generation is different from the value assumed at design. If the interconnection study gives a voltage range rather than a single number, send the range.

What the UL file does and does not cover

The file lists three series. The padmount series covers three-phase liquid-immersed units, 45 to 5000 kVA, 26 to 36 kV primary, aluminium windings, dead front, loop or radial, in mineral oil or natural ester. Two substation-type series extend the range to 30–7500 kVA across 17–36 kV. Everything in the file is three-phase. Single-phase padmounts, dry-type units, anything in the 15 kV class and anything above 36 kV sit outside it. We build several of those and quote them willingly — certification and third-party testing are then arranged per project and confirmed per contract. What we will not do is let a listing for one series imply coverage of another, because the first technical review will find it.

What to send with an enquiry

A one-line diagram or an existing nameplate photo is usually enough to start. Beyond that, the details that remove the most back-and-forth are: kVA rating, primary and secondary voltage, frequency, loop or radial, dead front or live front, fluid type, impedance if specified, tap range, enclosure finish, and the utility or site standard that applies. If a coordination study exists, the required impedance is in it. If there is a tender document, send that instead of retyping it.

Ratings, tolerances and tested values for any specific unit are confirmed per project and per contract. Figures on this page describe the listed product range and typical industry practice; they are not a specification for a particular build.

Ratings, tolerances and tested values for any specific unit are confirmed per project and per contract. Figures on this page describe the listed product range and typical industry practice; they are not a specification for a particular build.

Send a spec. Get a confirmed lead time the same day.

Rating, price and delivery — confirmed against your drawing, not a catalogue.

Request a quote

Padmount Transformer Ratings We Build To

Standard ratings follow IEEE C57.12.00 and C57.12.26. If your specification uses a rating outside this table we build to it, and we confirm the evaluation route in writing before the order.

Standard High-Voltage Ratings

High-voltage ratingClassInside our UL listing?
2400 Δ · 4160 GrdY/2400 · 4800 Δ2.5–5 kVBuilt to IEEE, outside the file
7200 · 8320 GrdY/48008.7 kVBuilt to IEEE, outside the file
12000 GrdY/6930 · 12470 GrdY/7200 · 13200 GrdY/7620 · 13800 GrdY/797015 kVBuilt to IEEE, outside the file
20780 GrdY/12000 · 22860 GrdY/13200 · 23000 Δ · 24940 GrdY/1440025 kVYes — SA series
34500 GrdY/19920 · 34500 Δ35 kVYes — PM3 and SF series

The GrdY/ notation states the line-to-line rating and the line-to-neutral rating of a grounded-wye winding. North American utility specifications are written this way, and we quote in the same form so the two documents compare line by line.

Standard Low-Voltage Ratings

208Y/120 · 240 · 480Y/277 · 480 · 600Y/347 · 600, and for larger ratings 2400Δ through 4800Δ.

Construction Options

Vector groupDyn1 · Dyn11 · YNyn0 · Dd0 · Yd11. Two units cannot be paralleled across different vector groups.
Impedance5.75 % is the common distribution value. Typical 5–6 % for distribution ratings, 6–8 % for larger units. A specific value is built where the coordination study requires it.
Winding materialCopper or aluminium, HV and LV. The padmount listing covers aluminium; a copper build moves the unit to a different series and a different evaluation, and we say so before the order.
CoolingONAN · ONAF · KNAN · KNAF. O is mineral oil, K is natural ester; AN natural air, AF forced air.
Front constructionDead front — separable insulated elbow connectors, no exposed energised metal with the door open. Live front — porcelain bushings behind a barrier, energised metal reachable. Dead front is the North American default in public areas.
Build time5–8 weeks from contract, confirmed per project against the approved drawing.
NOJS