Six things that decide most North American padmount enquiries, and where we actually stand on each.
A standard build runs 5–8 weeks from contract. Confirmed per project and per contract.
UL File E529552. Search it on UL Product iQ before you reply to us. We would rather you verify than take our word.
Dead front with loop feed or radial feed. Bushing count, parking stands and switch arrangement follow your one-line.
Mineral oil or natural ester, both inside the UL listing. Ester is specified on many indoor, vault and environmentally sensitive sites.
The padmount listing covers aluminium. If your spec mandates copper, say so early — that moves you to a different series and a different evaluation.
Send a one-line or a nameplate photo. Rating, price and a real delivery date come back the same working day.
We build three-phase liquid-immersed padmount transformers to order, against your one-line diagram and site standard, not from a catalogue of stock sizes. Every unit is routine tested before dispatch and shipped pre-assembled on its own pad. The work we take is project work — utility distribution, solar and storage, data centre and industrial sites — where a confirmed delivery date matters as much as the rating.
Three build types cover most enquiries. The first two sit inside our UL listing; the third does not, and we say so.
45–5000 kVA, 26–36 kV primary, 0.1–6.9 kV secondary. Dead front, loop or radial, aluminium windings, mineral oil or natural ester.
30–7500 kVA across 17–36 kV. Where a padmount enclosure is not required and the unit sits inside a fenced substation.
We build it, and it is not covered by that listing — the file is three-phase only. Certification is arranged per project.
Evaluated to IEEE C57.12.00, C57.12.28 and C57.12.90. Eight construction points that come up in nearly every technical review.
Separable elbow connectors, no exposed live parts.
Pentahead bolts, recessed handle, padlockable.
Six or three HV bushings to suit the feed.
Oil-immersed bayonet plus backup current-limiting.
Natural ester or mineral oil, both listed.
Blasted, primed and powder coated to C57.12.28.
Every unit tested before it leaves the floor.
Arrives complete on its pad, ready to set.
We build to your drawing, not from stock. A standard padmount transformer build runs 5–8 weeks from contract, against the approved drawing.
Final lead time is confirmed per project and per contract, against the approved drawing.
Three listed series. The file number is published rather than the claim, because the number is what your compliance reviewer will actually check on UL Product iQ.
The mainstream padmount transformer for utility distribution. Dead front, loop or radial feed, aluminium windings, mineral oil or natural ester.
Where the padmount transformer enclosure is not required and the unit sits inside a fenced substation on the same voltage class.
Copper windings, and the largest rating in the file. For 25 kV class systems where a padmount transformer is not the right form factor.
Evaluated to IEEE C57.12.00, C57.12.28 and C57.12.90. Canada: CCN XPLH7 on UL File E529552, to CSA C227.4, 75–3000 kVA.
Dry-type, single-phase, live front, primary below 17 kV (including 15 kV class), above 36 kV, and above 7500 kVA are not covered by this file. We will say so rather than imply otherwise. Units outside the listing are supplied with project-specific certification and third-party testing arranged per contract.
Photographs show production units. Ratings and certification coverage for any specific padmount transformer are confirmed per project and per contract.
Sizing tools you can use now, and the documents we can release. Test reports themselves are covered by UL confidentiality and are shared per project, not published.
Voltage and current to apparent power, single and three phase.
Real power to apparent power at a given power factor.
Available short-circuit current at the secondary, infinite-bus method.
Send the rating and voltage; we return a datasheet for that build.
Certificate of Compliance and the listed model ranges are public on UL Product iQ. Follow-Up Service Procedures and test records are not ours to publish.
Zhejiang Jiangshan Yuanguang Electric builds liquid-immersed distribution and substation transformers for export projects, with the padmount line evaluated by UL to IEEE C57.12.00, C57.12.28 and C57.12.90. Units are wound, assembled, filled and routine tested on site, then shipped pre-assembled. Better-Energy carries the same manufacturing lineage, tracing back to ZQ (Zhejiang Switchgear, 1965).
Quality management to ISO 9001 and ISO 14001. Capability for any specific rating is confirmed per project.
Padmount units come off one line in a plant that also builds transmission-class machines. The record below is for the power transformer line, 35 kV and above — not padmount. It is shown for one reason: that is the part of the plant an auditor looks at hardest, and it tells you what the winding, tanking and test facilities are actually rated to do.
| Market | Units | Years | Representative rating |
|---|---|---|---|
| Kyrgyzstan | 13 | 2025 | 16 MVA / 36.75–10.5 kV |
| Rwanda | 9 | 2024–2026 | 20 MVA / 110–15 kV |
| Uzbekistan | 7 | 2023–2026 | 10–25 MVA / 110 kV |
| Ukraine | 4 | 2025 | 40 MVA / 115–27.5–11 kV |
| Madagascar | 5 | 2025 | 25 MVA / 63 kV |
| Mexico | 4 | 2024–2025 | up to 60 MVA / 230–34.5 kV |
| Tajikistan | 4 | 2026 | 16 MVA / 110 kV |
| Philippines | 3 | 2025 | 12 MVA / 13.8–4.16 kV |
| Albania | 3 | 2024 | 25 MVA / 110–37–20.8 kV |
| Zambia | 3 | 2026 | 10 MVA / 33–11 kV |
| Malaysia | 2 | 2025 | 31 MVA / 33–11–0.415 kV |
| Georgia, Laos and Kazakhstan | 3 | 2024–2026 | 2.5–50 MVA / 35–115 kV |
A padmount transformer is a simpler machine than a 230 kV unit. A plant that builds, tests and ships the second has the first comfortably inside its envelope. That is the whole claim. It is not padmount delivery experience, and it is not part of the UL listing — the UL scope is set out separately above and is the document to read for compliance.
Counted line by line from the delivery register, export lines only. Domestic deliveries and lines without a recorded destination are excluded, so the real export total is higher than the figure shown. Customer names, project names and contract values are not published: several units were supplied through trading partners, whose client relationships are theirs to disclose. Delivery documentation for a specific line can be reviewed under NDA.
Four application patterns that account for most of what we quote.
Loop-feed dead front units on residential and commercial feeders. Bushing arrangement, fusing and finish follow the utility standard rather than a catalogue default.
Collector-side step-up duty with the load profile of an inverter plant. Impedance and tap range are set against the inverter and the interconnection study, not assumed.
Where the schedule is the constraint. Natural ester is frequently specified here for fire performance inside or close to the building envelope.
Motor-heavy loads where inrush and short-circuit contribution drive the impedance choice. A coordination study should confirm the figure before the rating is fixed.
| Rating | 45 – 5000 kVA |
| Primary voltage | 26 – 36 kV |
| Secondary voltage | 208Y/120 · 480Y/277 · 600Y/347 and others |
| Frequency | 60 Hz |
| Vector group | Dyn1, Dyn11 and others to order |
| Impedance | Typically 5 – 6 %, specified to suit downstream ratings |
| Windings | Aluminium |
| Insulating fluid | Natural ester or mineral oil |
| Cooling | ONAN |
| Temperature rise | 65 °C |
| Enclosure | Dead front, tamper-resistant, pad-mounting |
| Feed | Loop feed or radial feed |
| Accessories | Bayonet fuses, load-break switch, pressure relief, liquid level and temperature indication |
Parameters not listed are confirmed per project. Where a value affects a contractual obligation — losses, impedance, temperature rise, short-circuit withstand — it is confirmed against the test report, not estimated.
We manufacture them, but single-phase is not covered by that listing — the file is three-phase only. Certification for single-phase units is arranged per project.
Rating, primary and secondary voltage, vector group, impedance if specified, fluid type, feed arrangement, and any utility or site standard that applies. A one-line diagram or a spec sheet is enough to start.
The rating is the easy part. The delivery date is what your schedule actually turns on.
We do not publish customer quotes. Buyer names, projects and contacts stay confidential, and an anonymised testimonial proves nothing. These can be verified independently instead.
Search the file on UL Product iQ. You will see the listed model series and the company name, straight from the certification body.
Open UL Product iQ →IEEE C57.12.00, C57.12.28 and C57.12.90 for the US listing; CSA C227.4 for Canada. Named editions, not a generic claim of compliance.
We publish what the file does not cover as plainly as what it does. Single-phase, dry-type and 15 kV class are outside it. Suppliers who list everything as certified are worth a second look.
What actually decides the build. Open any topic that applies to your project — or send the one-line and we will tell you which ones matter.
This is the first fork, and it changes the tank. A radial-feed unit is fed from one direction and carries three high-voltage bushings. A loop-feed unit sits in a run with other transformers and carries six, so the circuit can pass through and be sectionalised without dropping every customer downstream. Loop feed costs more and takes more room in the HV compartment, and most utility distribution work specifies it because a fault on one segment should not black out the whole loop. If your one-line shows the transformer in the middle of a run, you are almost certainly looking at loop feed even if the specification does not say so.
Dead front means the high-voltage terminations are separable elbow connectors that are fully insulated and shielded, with no exposed energised metal when the compartment door is open. Live front, the older arrangement, leaves porcelain bushings exposed behind a barrier. In North America dead front is effectively the default for padmount installations in public areas, and it is what our UL listing covers. If a specification asks for live front, that unit falls outside our listing and we will say so rather than let the certification carry over by implication.
Impedance determines two things that pull in opposite directions. Lower impedance gives better voltage regulation and easier motor starting, but raises the available fault current at the secondary, which drives up the interrupting rating of everything downstream. Higher impedance limits fault current and lets you use cheaper downstream gear, at the cost of more voltage dip. Typical values run 5–6 percent for distribution ratings and 6–8 percent for larger units, but a specific value can be built if the downstream equipment rating or the motor starting requirement demands it. Whatever you choose, the tested impedance on the unit’s own test report is the figure a coordination study has to use — not the nameplate target and not a typical value from a table.
Both are inside our listing, so this is a project decision rather than a supplier constraint. Natural ester has a much higher fire point, which is why it appears in specifications for units inside buildings, in vaults, near occupied structures, or on sites with spill and environmental constraints. It is also readily biodegradable. The trade-offs are cost, slightly different thermal behaviour, and the need to keep the fluid type consistent with the site maintenance programme — ester and mineral oil are not casually interchangeable once a unit is in service. If your site standard is silent on fluid, the fire code and the distance to the nearest occupied structure usually settle it.
Our padmount listing covers aluminium windings. Aluminium is the mainstream choice for distribution padmounts in North America: lighter, lower material cost, and entirely standard in utility service when the conductor is sized correctly. Copper is specified on some industrial and institutional projects, occasionally for space reasons and occasionally as an inherited habit. If your specification mandates copper, raise it at enquiry stage — it moves the unit to a different series with a different evaluation, and it is better established before quotation than after.
Most padmount units use oil-immersed bayonet fuses in series with backup current-limiting fuses. The bayonet is the accessible, replaceable element that clears overloads and low-level faults; the backup current-limiting fuse handles high-magnitude faults that the bayonet cannot interrupt safely. The pairing matters, because a bayonet alone leaves the unit exposed on a bolted fault and a current-limiting fuse alone makes routine maintenance far more disruptive. If the specification names a particular fuse curve, send it — fuse coordination is easier to build in than to retrofit.
De-energised tap changers on padmount units typically give plus or minus two 2.5 percent steps on the primary. That is enough to trim for a long feeder or a high source voltage, and it is not enough to solve a genuine voltage problem. On solar and storage sites the tap range is regularly wrong on first pass, because the collector-side voltage under full generation is different from the value assumed at design. If the interconnection study gives a voltage range rather than a single number, send the range.
The file lists three series. The padmount series covers three-phase liquid-immersed units, 45 to 5000 kVA, 26 to 36 kV primary, aluminium windings, dead front, loop or radial, in mineral oil or natural ester. Two substation-type series extend the range to 30–7500 kVA across 17–36 kV. Everything in the file is three-phase. Single-phase padmounts, dry-type units, anything in the 15 kV class and anything above 36 kV sit outside it. We build several of those and quote them willingly — certification and third-party testing are then arranged per project and confirmed per contract. What we will not do is let a listing for one series imply coverage of another, because the first technical review will find it.
A one-line diagram or an existing nameplate photo is usually enough to start. Beyond that, the details that remove the most back-and-forth are: kVA rating, primary and secondary voltage, frequency, loop or radial, dead front or live front, fluid type, impedance if specified, tap range, enclosure finish, and the utility or site standard that applies. If a coordination study exists, the required impedance is in it. If there is a tender document, send that instead of retyping it.
Ratings, tolerances and tested values for any specific unit are confirmed per project and per contract. Figures on this page describe the listed product range and typical industry practice; they are not a specification for a particular build.
Ratings, tolerances and tested values for any specific unit are confirmed per project and per contract. Figures on this page describe the listed product range and typical industry practice; they are not a specification for a particular build.
Rating, price and delivery — confirmed against your drawing, not a catalogue.
Request a quoteStandard ratings follow IEEE C57.12.00 and C57.12.26. If your specification uses a rating outside this table we build to it, and we confirm the evaluation route in writing before the order.
| High-voltage rating | Class | Inside our UL listing? |
|---|---|---|
| 2400 Δ · 4160 GrdY/2400 · 4800 Δ | 2.5–5 kV | Built to IEEE, outside the file |
| 7200 · 8320 GrdY/4800 | 8.7 kV | Built to IEEE, outside the file |
| 12000 GrdY/6930 · 12470 GrdY/7200 · 13200 GrdY/7620 · 13800 GrdY/7970 | 15 kV | Built to IEEE, outside the file |
| 20780 GrdY/12000 · 22860 GrdY/13200 · 23000 Δ · 24940 GrdY/14400 | 25 kV | Yes — SA series |
| 34500 GrdY/19920 · 34500 Δ | 35 kV | Yes — PM3 and SF series |
The GrdY/ notation states the line-to-line rating and the line-to-neutral rating of a grounded-wye winding. North American utility specifications are written this way, and we quote in the same form so the two documents compare line by line.
208Y/120 · 240 · 480Y/277 · 480 · 600Y/347 · 600, and for larger ratings 2400Δ through 4800Δ.
| Vector group | Dyn1 · Dyn11 · YNyn0 · Dd0 · Yd11. Two units cannot be paralleled across different vector groups. |
| Impedance | 5.75 % is the common distribution value. Typical 5–6 % for distribution ratings, 6–8 % for larger units. A specific value is built where the coordination study requires it. |
| Winding material | Copper or aluminium, HV and LV. The padmount listing covers aluminium; a copper build moves the unit to a different series and a different evaluation, and we say so before the order. |
| Cooling | ONAN · ONAF · KNAN · KNAF. O is mineral oil, K is natural ester; AN natural air, AF forced air. |
| Front construction | Dead front — separable insulated elbow connectors, no exposed energised metal with the door open. Live front — porcelain bushings behind a barrier, energised metal reachable. Dead front is the North American default in public areas. |
| Build time | 5–8 weeks from contract, confirmed per project against the approved drawing. |
Expert review of single-line diagrams, voltage ratings, and cooling methods before quotation.