Pad-mounted transformers 45–5000 kVA, 26–36 kV — UL File E529552. Standard lead time 5–8 weeks from contract; volume schedules confirmed per project. UL File E529552 · pad-mounted 45–5000 kVA — 5–8 weeks from contract, volume per project Send your one-line diagram →
YGT Logo
Chat with us
Substation Background
YGT Logo

Industrial & Utility Transformer Specifications

Review technical parameters, cooling configurations, and terminal arrangements for oil-immersed, pad-mounted, and dry-type transformers. Sizing and specification review support for North American grid interconnection, industrial plant distribution, and renewable energy projects.

Electrical Power Transformer

Power transformers for utility substations, industrial plants, renewable energy projects and infrastructure developments. Engineered for high reliability, efficiency, and seamless grid integration across North America.

Voltage Review
Drawing Review
Test Documents
Project RFQ Support
Large power transformer installed in utility substation

Quick Buyer Overview

Essential parameters and procurement criteria for power transformer sourcing and specification planning.

For winding selection and quotation requirements, see our power transformer range.

Capacity Range

From 5 MVA up to 200 MVA. Engineered to support heavy industrial loads, utility step-down, and renewable energy collection systems.

Voltage Range

Primary voltages including 34.5kV, 69kV, 115kV, 138kV, and up to 230kV. Secondary voltages customized to specific grid or plant requirements.

Cooling Methods

Standard ONAN (Oil Natural Air Natural) with optional ONAF (Oil Natural Air Forced) using radiator fans to increase capacity by up to 33%.

Applications

Deployed in utility substations, solar farms, wind farms, mining sites, data centers, and heavy industrial processing plants.

Available Documents

Comprehensive documentation including GA drawings, routine test reports, type test reports, nameplate drafts, and installation manuals.

RFQ Information Required

To provide an accurate quote, we require MVA rating, primary/secondary voltage, frequency, vector group, impedance, and cooling method.

What Is An Electrical Power Transformer?

Definition

An electrical power transformer is a static piece of critical infrastructure designed to transfer electrical energy between two or more circuits through electromagnetic induction. Unlike distribution transformers which step down voltage for end-user consumption, power transformers are typically deployed in high-voltage transmission networks, utility substations, and large-scale industrial plants.

Working Principle

Operating on Faraday's law of induction, alternating current in the primary winding creates a varying magnetic flux in the transformer core. This flux induces a varying electromotive force (EMF) or voltage in the secondary winding. The efficiency of this energy transfer is highly dependent on the quality of the core material and the precision of the winding process.

Voltage Transformation

The primary function is to step up voltage for long-distance transmission (reducing line losses) or step down voltage to safe levels for regional distribution and industrial utilization. The transformation ratio is directly proportional to the number of turns in the primary and secondary windings.

  • Primary Winding: Receives the input voltage from the source network.
  • Secondary Winding: Delivers the transformed output voltage to the load.
  • Core: High-permeability silicon steel providing a low-reluctance path for magnetic flux.
  • Voltage Ratio: Determines the exact step-up or step-down factor based on engineering specifications.
Transformer operation diagram showing primary winding, secondary winding, and core

Applications & Industries

Engineered solutions for diverse project environments, ensuring stable power delivery across critical sectors.

Utility Substation

Utility Substation

Application: Grid distribution

Typical Voltage: 69kV - 230kV

Typical Capacity: 10MVA - 100MVA

Buyer Concerns: Grid compliance, extreme weather reliability, vector group matching.

Power Plant

Power Plant

Application: Generator step-up (GSU)

Typical Voltage: Up to 345kV

Typical Capacity: 50MVA - 500MVA

Buyer Concerns: Continuous base-load operation, thermal management, rigorous FAT.

Solar Farm

Solar Farm

Application: Renewable collection

Typical Voltage: 34.5kV - 115kV

Typical Capacity: 20MVA - 150MVA

Buyer Concerns: Harmonic mitigation, variable load cycling, inverter compatibility.

Wind Farm

Wind Farm

Application: Onshore/Offshore grid tie

Typical Voltage: 34.5kV - 138kV

Typical Capacity: 30MVA - 200MVA

Buyer Concerns: High transient overvoltages, compact footprint, environmental protection.

Mining Site

Mining Site

Application: Heavy extraction power

Typical Voltage: 13.8kV - 69kV

Typical Capacity: 5MVA - 50MVA

Buyer Concerns: Dust ingress, vibration resistance, robust overload capability.

Industrial Plant

Industrial Plant

Application: Manufacturing facilities

Typical Voltage: 12.47kV - 115kV

Typical Capacity: 10MVA - 80MVA

Buyer Concerns: Uptime reliability, custom impedance, footprint constraints.

Data Center

Data Center

Application: High-availability IT power

Typical Voltage: 34.5kV - 115kV

Typical Capacity: 20MVA - 100MVA

Buyer Concerns: N+1 redundancy, low noise levels, rapid deployment schedules.

Infrastructure Project

Infrastructure Project

Application: Rail & Public Works

Typical Voltage: 25kV - 138kV

Typical Capacity: 15MVA - 60MVA

Buyer Concerns: Long-term lifecycle costs, public safety standards, compliance.

Product Structure & Components

Detailed breakdown of the core components that ensure the longevity and efficiency of our power transformers.

Annotated transformer image showing internal and external components

Core

Manufactured from high-permeability cold-rolled grain-oriented (CRGO) silicon steel. Precision-cut and stacked to minimize no-load losses and reduce operating noise.

Winding

Constructed using electrolytic grade copper or aluminum. Engineered with advanced insulation paper for optimal thermal distribution and high electrical stress resistance.

Radiator

Detachable cooling fins designed to maximize surface area. Allows for efficient natural heat dissipation (ONAN) or forced air cooling (ONAF) when equipped with fans.

Bushing

High-voltage porcelain or composite polymer insulators that allow safe passage of electrical conductors through the grounded transformer tank.

Conservator

An expansion tank mounted above the main unit that accommodates insulating oil volume changes caused by temperature fluctuations during operation.

Oil Tank

Heavy-duty welded steel enclosure. Vacuum-tested to ensure zero leakage, sandblasted, and coated with industrial-grade anti-corrosion paint.

OLTC (On-Load Tap Changer)

A sophisticated mechanical and electrical mechanism used to regulate the output voltage dynamically without interrupting the power supply.

Protection Devices

Includes Buchholz relays for gas detection, pressure relief valves, oil temperature indicators (OTI), and winding temperature indicators (WTI) for comprehensive safety.

Nameplate

A permanent stainless steel plate detailing critical specifications, vector groups, impedance values, and serial data required for lifecycle tracking and maintenance.

Technical Specifications

Standard parameters for our power transformer series. Custom engineering is available upon project review.

Parameter Standard Specification Range
Capacity 5 MVA to 200 MVA
Primary Voltage 34.5 kV, 69 kV, 115 kV, 138 kV, 230 kV
Secondary Voltage 4.16 kV, 12.47 kV, 13.8 kV, 34.5 kV
Frequency 60 Hz (US/North America Standard) / 50 Hz
Phase 3-Phase (Single-phase available for specific applications)
Cooling Method ONAN / ONAF / OFAF / ODAF
Impedance 5% to 12% (Customizable based on short-circuit study)
Vector Group Dyn1, Dyn11, YNd1, YNd11 (Custom configurations available)
Temperature Rise 55°C / 65°C over 30°C average ambient
Installation Type Outdoor Substation Foundation / Indoor Vault

Available Transformer Types

Explore our range of specialized power transformers built for diverse grid applications.

Oil Immersed Power Transformer

Oil Immersed Power Transformer

Standard liquid-filled units utilizing mineral oil or bio-degradable fluids for superior insulation and cooling.

Request Specs
High Voltage Power Transformer

High Voltage Power Transformer

Engineered for transmission networks, handling primary voltages up to 230kV with extreme reliability.

Review Voltage Class
Substation Transformer

Substation Transformer

Designed as the core node for utility and industrial substations, featuring robust short-circuit withstand capabilities.

View Substation Models
Generator Step Up Transformer

Generator Step Up Transformer

Directly connected to power plant generators (GSU) to step up voltage for long-distance transmission.

Check GSU Specs
OLTC Transformer

OLTC Transformer

Equipped with On-Load Tap Changers to maintain stable secondary voltage despite primary grid fluctuations.

Explore OLTC Options
ONAF Transformer

ONAF Transformer

Features forced air cooling fans on radiators, allowing for a 25% to 33% increase in temporary load capacity.

Review Cooling Methods

How To Choose The Right Transformer

A systematic 7-step approach to specifying and procuring power transformers for your project.

1

Load Requirement

Calculate peak load, continuous load, and future expansion needs.

2

Voltage Confirmation

Define primary grid connection and secondary load voltages.

3

Capacity Selection

Choose base MVA rating with appropriate safety margins.

4

Cooling Selection

Decide between ONAN or ONAF based on peak load duration.

5

Installation Review

Assess site altitude, ambient temp, and foundation limits.

6

Document Review

Compile single-line diagrams and utility standards.

7

RFQ Submission

Submit specs to our engineering team for pricing.

Comparison Center

Technical comparisons to help clarify engineering decisions and optimize project budgets.

Power Transformer vs Distribution Transformer

Feature Power Transformer Distribution Transformer
ApplicationTransmission networks, SubstationsEnd-user distribution
Voltage LevelTypically > 34.5kVTypically < 34.5kV
Capacity5 MVA and aboveUnder 5 MVA
Load VariationOperates near full load continuouslyHighly variable daily load cycle
Efficiency DesignMax efficiency at 100% loadMax efficiency at 50-70% load

Oil Immersed vs Dry Type

Feature Oil Immersed Dry Type (Cast Resin)
Cooling MediumMineral Oil / Ester FluidAir / Epoxy Resin
InstallationOutdoor (typically)Indoor (strict fire safety)
MaintenanceRequires oil sampling/testingVirtually maintenance-free
Overload CapacityExcellent thermal massLimited overload capability
CostMore economical for high MVAHigher initial cost

ONAN vs ONAF

Feature ONAN ONAF
Cooling MethodOil Natural Air NaturalOil Natural Air Forced
Radiator FansNoneEquipped with automated fans
Capacity IncreaseBase rating (100%)Up to 133% of base rating
Noise LevelLower (only core noise)Higher (fan noise added)
ApplicationStandard continuous loadPeak shaving, contingency loads

OLTC vs OCTC

Feature OLTC (On-Load) OCTC (Off-Circuit)
Tap ChangingWhile transformer is energizedRequires complete de-energization
Voltage RegulationDynamic, automated adjustmentStatic, manual adjustment
ComplexityHigh mechanical complexitySimple mechanical switch
MaintenanceRequires separate oil compartment careMinimal maintenance
CostPremium investmentStandard cost

Inspection, Testing & Documents

Rigorous quality assurance protocols compliant with international standards to guarantee field reliability.

Transformer factory testing and inspection

Standard Testing Protocols

  • Routine Test: Conducted on 100% of units to verify basic functionality and safety.
  • Ratio Test: Verifies the exact voltage transformation ratio matches the design.
  • Insulation Test: Megger testing to ensure dielectric strength between windings and ground.
  • No Load Loss Test: Measures core losses while the secondary is open-circuited.
  • Load Loss Test: Measures copper losses under full-load simulated conditions.
  • Factory Inspection (FAT): Client-witnessed acceptance testing before dispatch.
  • Third Party Inspection: Optional SGS/TUV verification available upon request.

Project Document Wall

Routine Test Report
Type Test Report
Factory Test Report
GA Drawings
Packing List
Nameplate Draft

Packaging, Shipping & Installation

Secure logistics and structured site integration to protect your heavy equipment investment.

Export Packing & Container Loading

Units are drained of oil (if exceeding weight limits), filled with dry nitrogen to prevent moisture ingress, and secured using heavy-duty timber crates and steel lashing inside flat rack or standard containers.

Heavy Transport & Site Delivery

Coordination with specialized heavy-haul logistics providers. Route surveys are conducted for oversized units to ensure safe passage to remote substations or industrial sites.

Foundation Preparation

Detailed civil drawings provided in advance to prepare concrete pads, oil containment pits, and grounding grids prior to equipment arrival.

Installation Workflow & Maintenance Checklist

Re-assembly of radiators and bushings, vacuum oil filling on-site, final megger testing, and handover of routine maintenance checklists for lifecycle management.

Transformer export packing Transformer heavy transport Transformer site installation Substation foundation preparation

Why YGT

Factual, engineering-focused support designed for US-based procurement and project execution.

Specification Review Before Quotation

We do not provide blind quotes. Our engineering team reviews your single-line diagrams and tender specs to ensure the offered transformer meets exact grid compliance.

Nameplate Review Support

We assist in analyzing existing equipment nameplates to match vector groups, impedance, and physical dimensions for seamless replacement projects.

Drawing Review Support

Detailed General Arrangement (GA) drawings are provided for civil engineers to confirm pad dimensions, cable entry points, and clearance radii.

Selected Test Documents

Access to historical type test reports and routine test data to satisfy utility approval boards and third-party engineering consultants.

Project-Based RFQ Support

Dedicated account managers assist EPCs and electrical contractors in compiling comprehensive bid packages for large-scale utility and industrial tenders.

Houston Warehouse Plan Targeted For 2027

Strategic expansion to establish local inventory and rapid deployment capabilities for standard pad mount and substation units in the US market.

Frequently Asked Questions

How do I select the right capacity (MVA) for my power transformer?
Capacity selection should be based on your calculated peak load, adding a 20-25% safety margin for future expansion. For variable loads, consider ONAF cooling to handle temporary peaks without oversizing the base MVA.
What is the difference between primary and secondary voltage ratings?
Primary voltage is the input from the source grid (e.g., 138kV transmission line), while secondary voltage is the output delivered to your load (e.g., 13.8kV for plant distribution). The ratio between them defines the transformer's step-up or step-down function.
When should I choose ONAN vs ONAF cooling methods?
Choose ONAN (Oil Natural Air Natural) for steady, continuous loads. Specify ONAF (Oil Natural Air Forced) if you anticipate periodic peak loads that exceed the base rating, as fans can increase cooling capacity by up to 33%.
What standard factory tests are performed?
Every unit undergoes Routine Tests including voltage ratio, winding resistance, insulation resistance (Megger), no-load loss, and load loss testing in accordance with IEEE/ANSI or IEC standards.
Which technical documents are required before placing an order?
We require approved General Arrangement (GA) drawings, a confirmed technical specification sheet, and a signed electrical single-line diagram to ensure exact manufacturing compliance.
What are the foundation and installation requirements?
Substation transformers require a reinforced concrete pad capable of supporting the full operating weight (including oil), alongside an oil catchment pit for environmental compliance.
How often should routine maintenance be performed?
Visual inspections should be monthly. Dissolved Gas Analysis (DGA) of the insulating oil and standard electrical testing (Megger, TTR) should be conducted annually to ensure longevity.
What factors influence the pricing of a power transformer?
Key pricing factors include MVA capacity, voltage class, copper vs aluminum windings, inclusion of an OLTC, specific impedance requirements, and current raw material costs (copper and core steel).
Can you manufacture transformers to specific US utility standards?
Yes, our engineering team reviews your specific utility specifications (e.g., IEEE C57.12.00) to ensure full compliance before generating a quotation.
What is the typical lead time for a 50 MVA power transformer?
Lead times vary based on factory loading and material availability, but typically range from 24 to 36 weeks ex-works for engineered-to-order units of this size.
How do you handle heavy transport and site delivery?
We coordinate with specialized heavy-haul freight forwarders. Units are often shipped without oil and radiators to reduce weight, filled with dry nitrogen for transit, and reassembled on-site.
What is an OLTC and when is it necessary?
An On-Load Tap Changer (OLTC) allows the transformer to adjust its voltage ratio while energized. It is necessary when the primary grid voltage fluctuates frequently and a stable secondary voltage is critical.
What information is needed to review a transformer nameplate?
A clear photo of the existing nameplate is ideal. Key data includes MVA rating, High/Low Voltages, Vector Group, Impedance (%Z), and physical dimensions for replacement planning.
Are third-party inspection services available?
Yes, we fully support Factory Acceptance Testing (FAT) witnessed by the client or independent third-party agencies like SGS or TUV at the buyer's discretion.
Do you provide support for tender document review?
Absolutely. Our engineering team routinely assists EPCs and contractors by reviewing comprehensive tender packages to ensure our proposed solution is technically compliant and competitively priced.

Get a quotation

Ratings, lead time and certification coverage Ratings, lead time and certification coverage are confirmed per project and per contract.

YGT Logo

orin.fang@bepowerglobal.com

15305704090

Room 1108, Xingang Building, No. 91 Huayuan Middle Avenue, Kecheng District, Quzhou, Zhejiang, China

Utility & Solar Applications

Pad Mounted Transformer Configuration

A solar farm developer may require loop feed pad mounted transformers for a 50MW collection network. The project constraint often involves tight spacing on pre-cast concrete pads and strict utility interconnection standards regarding fault current limits.

Specifying a 34.5kV primary, dead front configuration with specific bushing arrangements and defined impedance values addresses these constraints. Reviewing the foundation layout and cable entry direction before quotation ensures the unit fits the existing civil design, preventing site modification delays during installation.

Key RFQ Inputs Required:

  • • kVA Rating
  • • Primary / Secondary Voltage
  • • Radial or Loop Feed
  • • Dead Front / Live Front
  • • Tap Changer Requirement
  • • Applicable Standard (IEEE/ANSI)
Solar Farm Transformer Installation

EPC Substation Projects

Power Transformer Logistics & Sizing

An EPC contractor building a 115kV utility substation faces transport weight limits and specific impedance requirements for short-circuit fault current calculations.

Selecting a 30/40/50 MVA rating with ONAN/ONAF/ONAF cooling stages and an On-Load Tap Changer (OLTC) matches variable load profiles. Confirming shipping dimensions, oil weight, and radiator arrangement early allows the logistics team to secure specialized transport permits without extending the project schedule.

Inspection & Testing Scope:

Inspection scope depends on project requirements. Typical reviews include:

  • • Routine Test Reports
  • • Factory Witness Inspection
  • • Nameplate Drawing Review
  • • Container Loading Records
Transformer Transport and Logistics

Configuration Comparison

Evaluating insulation medium and cooling methods based on installation environment and maintenance access.

Parameter Oil-Immersed Transformers Dry-Type (Cast Resin)
Typical Installation Outdoor substations, concrete pads, pole mounts Indoor electrical rooms, commercial basements
Cooling Method ONAN, ONAF, OFAF (Mineral Oil / Ester Fluid) AN, AF (Air Natural / Air Forced)
Maintenance Access Requires oil sampling, DGA testing, oil filtration Visual inspection, dust removal, torque checks
Fire Risk Profile Requires containment bunds or fire walls in dense areas Self-extinguishing, suitable for high-density buildings
Overload Capacity Higher thermal inertia, better short-term overload handling Lower thermal inertia, requires forced cooling for overloads

Engineering Document Review

Procurement uncertainty is reduced by establishing clear technical baselines before manufacturing. Selected test reports and compliance documents may be available depending on transformer type and voltage class.

Pre-Production Drawings

General Arrangement (GA) drawings, foundation layouts, and nameplate drafts are submitted for engineering approval to verify terminal orientation and mounting dimensions.

Inspection & Test Records

Routine test reports covering voltage ratio, vector group, winding resistance, and impedance voltage. Third-party inspection arrangements can be coordinated upon request.

Logistics Documentation

Packing lists, commercial invoices, bill of lading, and container loading photos. Impact recorder data can be provided for large power transformers to verify transport integrity.

Technical & Procurement FAQ

Expert answers to common engineering, testing, and procurement questions for electrical power transformers.

How do I select the correct kVA/MVA capacity for my power transformer?
Capacity selection depends on your total connected load, future expansion plans, and required redundancy. For industrial and utility applications, it is standard engineering practice to size the transformer at 80% of its maximum rating under normal conditions to allow for peak demands, harmonic heating, and long-term load growth without accelerating insulation aging.
What primary and secondary voltage configurations do you support?
We manufacture power transformers for all major voltage classes, including common North American utility voltages such as 13.8kV, 34.5kV, 69kV, 115kV, and up to 230kV primary. Secondary voltages are fully customized to match your medium voltage switchgear, distribution network, or specific industrial equipment requirements.
What is the difference between ONAN and ONAF cooling methods?

Cooling methods determine the transformer's heat dissipation capability and overload capacity. Standard configurations include:

Method Description Application
ONAN Oil Natural, Air Natural Standard base rating relying on natural convection.
ONAF Oil Natural, Air Forced Increases capacity by 25-33% using radiator fans.
OFAF Oil Forced, Air Forced For high-capacity utility and generation step-up units.
What factory acceptance tests (FAT) are performed before shipment?

All transformers undergo rigorous routine testing in accordance with IEEE/ANSI C57.12.00 and IEC 60076 standards prior to shipment. Standard Factory Acceptance Tests include:

  • Winding resistance measurement
  • Voltage ratio, polarity, and vector group verification
  • Impedance voltage and load loss measurement
  • No-load loss and excitation current measurement
  • Applied potential and induced overvoltage withstand tests
  • Insulation resistance (Megger) testing

Type tests (such as temperature rise or lightning impulse) and special tests (like sweep frequency response analysis) can be incorporated into the project scope upon request.

What technical documentation is provided with the transformer?
Standard deliverables include General Arrangement (GA) drawings, schematic wiring diagrams for control cabinets, certified routine test reports, comprehensive Operation & Maintenance (O&M) manuals, nameplate drawings, and detailed packing lists. Third-party inspection reports can also be provided if specified during the RFQ stage.
What are the foundation requirements for large power transformers?
Power transformers require a heavily reinforced concrete pad designed by structural engineers to support the full operational weight of the unit (including oil and accessories). Additionally, an oil containment pit or moat is typically required by local environmental regulations (such as EPA SPCC rules in the U.S.) to capture any potential fluid leaks.
What routine maintenance is required for oil-immersed power transformers?
Key preventive maintenance tasks include annual Dissolved Gas Analysis (DGA) and oil quality testing, visual inspections of bushings and radiators for seepage, replacing silica gel in breathers when discolored, verifying the operation of cooling fans and pumps, and testing the calibration of protection relays (Buchholz, temperature monitors).
What factors influence the pricing of a power transformer?
Pricing is primarily driven by the kVA/MVA capacity, primary and secondary voltage classes, raw material index costs (copper/aluminum core and windings), required cooling method, specific impedance requirements, loss capitalization formulas, and the inclusion of complex accessories like On-Load Tap Changers (OLTC) or specialized smart monitoring equipment.
How do I determine the correct vector group for my project?
The vector group (e.g., Dyn1, YNd11) defines the winding configuration (Delta or Wye) and phase displacement between the primary and secondary sides. It must perfectly match your existing electrical system to ensure proper synchronization, especially if the transformer will operate in parallel with other units or generation sources.
Why is impedance voltage important in your transformer design?
Impedance voltage determines the voltage drop under load and, critically, limits the maximum short-circuit fault current that can flow through the transformer. Specifying the correct impedance is essential for coordinating with downstream switchgear protection relays and ensuring overall system stability during fault conditions.
What standard accessories are included with your power transformers?
Standard accessories typically include a magnetic oil level indicator, dial-type oil and winding temperature thermometers with alarm/trip contacts, pressure relief device (PRD), Buchholz relay (for conservator tank designs), dehydrating silica gel breather, drain and oil sampling valves, grounding pads, and a stainless steel rating nameplate.
What type of insulating oil is used in your transformers?
We standardly supply high-quality, uninhibited or inhibited mineral insulating oil fully compliant with ASTM D3487 or IEC 60296 standards. For indoor installations, environmentally sensitive areas, or high-fire-risk sites, we can engineer the transformer to use less-flammable ester-based natural or synthetic fluids (such as FR3).
How are large power transformers packaged and shipped?
To safely manage extreme weight and dimensional limits, large power transformers are often shipped drained of oil and pressurized with dry nitrogen or dry air to protect the active core and windings. External components like radiators, high-voltage bushings, and conservators are removed, sealed, and packed securely in separate heavy-duty wooden crates for sea freight and heavy-haul transport.
What is the standard warranty period for your power transformers?
We typically offer a standard 12 to 24-month warranty from the date of site commissioning, or 18 to 30 months from the date of factory shipment—whichever occurs first. Extended warranty terms, spare parts packages, and long-term service agreements can be negotiated based on specific project requirements.
Can you manufacture transformers to specific U.S. utility standards?
Yes, our engineering team is highly experienced in designing custom power transformers that strictly comply with IEEE C57.12.00 series standards. We frequently align our designs with specific regional utility specifications regarding loss evaluation formulas (A and B factors), overload capabilities, footprint constraints, and specialized control cabinet wiring.

Submit Your Project RFQ

Provide your technical specifications, single-line diagrams, or tender documents for a comprehensive engineering review and formal quotation.

Get a quotation

Ratings, lead time and certification coverage Ratings, lead time and certification coverage are confirmed per project and per contract.

Submit Project Specifications

Send us your single-line diagram, existing nameplate, or tender document. Our engineering team will review the kVA rating, voltage parameters, and cooling requirements to provide a technical proposal and baseline quotation.

Email for Drawings

orin.fang@bepowerglobal.com

Engineering Support

15305704090

Office Location

Room 1108, Xingang Building, No. 91 Huayuan Middle Avenue, Kecheng District, Quzhou, Zhejiang, China

Request a quotation

Ratings, lead time and certification coverage Ratings, lead time and certification coverage are confirmed per project and per contract.